More than a facelift, the Salève cable car is set for a complete transformation. Its lower and upper stations will be revamped in 2020 and 2021. The work is expected to last around eighteen months, requiring the facility to close for several months. The lower station will be entirely rebuilt, while the iconic upper station, designed by the legendary Maurice Braillard, will be stripped of its 1980s annexes and expanded to accommodate a panoramic restaurant, as envisaged in the original plans… Read the article
More than a facelift, the Salève cable car is set for a complete transformation. Its lower and upper stations will be revamped in 2020 and 2021. The work is expected to last around eighteen months, requiring the facility to close for several months. The lower station will be entirely rebuilt, while the iconic upper station, designed by the legendary Maurice Braillard, will be stripped of its 1980s annexes and expanded to accommodate a panoramic restaurant, as envisaged in the original plans… Read the article